Welder Dave
Senior Member
The property I'm getting and hoping to put a new MX track on has sand on top but I think if I dig down deep enough it is clay. The field is flat but in the back there are valleys that are lower and there are a few small ponds. I will need clay anyway so was thinking of stripping the sand off and digging a pond on the higher portion of the field. I'm hoping it would hold rain water and snow run off I could use for watering the track. I don't know if it will hold water though being higher? I realize it could evaporate but was thinking the hole could be 6' or more deep. The gravel pit said they would send a dozer over maybe a D6 or D7 which I think could make a 2000yd. pond pretty quick but maybe I'm wrong. I don't know if they would send an excavator over.
Last edited: