• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

I dare a dozer operator to show me a better floor grade

aussiechunda

Active Member
Joined
May 19, 2026
Messages
37
Location
australia
Pic related was done using a cat988xe not a dozer and the material used was concrete from demo sites not finished product.
Questions?1000000951.jpg
 

Tinkerer

Senior Member
Joined
May 21, 2009
Messages
10,167
Location
usa
I could with a wide track D6 angle blade dozer.
I lost count, but I think I was lucky enough to have had 5 brand new ones through the years.
Even more New D8N's. Not bragging - simply explaining my experience.
I spent a fair amount of time on 988's and there isn't rubber tired loader made that can produce a finish grade as well or as fast as a dozer.
 

Welder Dave

Senior Member
Joined
Oct 11, 2014
Messages
18,065
Location
Canada
If it was pushing dumped material off what was generally flat to begin with, it shouldn't be that hard with a loader with return-to-dig to get it back to what it was. If was really rough to begin with is pretty impressive.
 

aussiechunda

Active Member
Joined
May 19, 2026
Messages
37
Location
australia
You nitpickers need to go lay down. That is a damn fine grade for a concrete demo dump site and like I said before, none of your dozers will compact it like a full bucket 988 does. Sheesh! I'd still have to get off and get on the roller.
They
are just spoiled with their tilting blades
If it was pushing dumped material off what was generally flat to begin with, it shouldn't be that hard with a loader with return-to-dig to get it back to what it was. If was really rough to begin with is pretty impressive.
Pic related is what it generally looks like after a week before I fix the floors, its a live face so it moves back and forth and the excavators like to do sick spinning tricks on it which tears it up 1000000990.jpg
 

Tinkerer

Senior Member
Joined
May 21, 2009
Messages
10,167
Location
usa
You nitpickers need to go lay down. That is a damn fine grade for a concrete demo dump site and like I said before, none of your dozers will compact it like a full bucket 988 does. Sheesh! I'd still have to get off and get on the roller.
No nitpicking on my part.
That is a real nice looking dump.
The subject of the op's thread is/was a challenge to dozer operators.
I am curious tho where the concrete came from. I didn't see any rewire or reinforcing rods in it.
 

aussiechunda

Active Member
Joined
May 19, 2026
Messages
37
Location
australia
No nitpicking on my part.
That is a real nice looking dump.
The subject of the op's thread is/was a challenge to dozer operators.
I am curious tho where the concrete came from. I didn't see any rewire or reinforcing rods in it.
Its in there, escavators munched it and also take out as much of it as they can, the rest is taken out by the 3 electro magnets in the crushing plant 1000000816.jpg1000001063.jpg1000001038.jpg
 
Last edited:

skyking1

Senior Member
Joined
Nov 3, 2020
Messages
9,606
Location
washington
No nitpicking on my part.
That is a real nice looking dump.
The subject of the op's thread is/was a challenge to dozer operators.
I am curious tho where the concrete came from. I didn't see any rewire or reinforcing rods in it.
The funny thing is, nobody has posted a picture of some finish grade they made recently.
@CM1995 posted a couple of shots of his dump site out the windscreen. Nothing to write home about. :p
Posting up GPS assisted grading does not count either. This is eyeball stuff.
I'll go first.
May '26
some excavator grade I made backing up and carrying, and matching to wall etc. This is where I ran out of material.
PXL_20260525_204009214-1.jpg

last summer storm pipe remove and replace.
Before:
PXL_20250616_175459025-1-1.jpg

During:
PXL_20250618_173941405_copy_1280x960.jpg

after:
PXL_20250619_001452485_copy_1280x960-1.jpg
No grade beaming or hoe packing, just scrape and track.
Shimmy I know you have some pretty tailing grade outs, those count.
 

Tones

Senior Member
Joined
Mar 15, 2009
Messages
4,218
Location
Ubique
Occupation
Ex land clearing contractor, part-time retired
A very interesting thread. It takes me back to 1972 and operating a AC 545. Bugger all excavators around at that time so the primary roll for this little loader was excavation work and cutting to grade without all the wiz bang electronic wizardry on today's machines. String line, sprint level and tape measure was it.
There's a definite art in using a loader for this work which I didn't have when I started but a little mentoring from an old Bugger (thanks Bernie) with a busted back who operated the loader gave some good advice, even to the point of explaining that pivot steer loaders have a built-in side tilt bucket.
 

Tones

Senior Member
Joined
Mar 15, 2009
Messages
4,218
Location
Ubique
Occupation
Ex land clearing contractor, part-time retired
The funny thing is, nobody has posted a picture of some finish grade they made recently.
@CM1995 posted a couple of shots of his dump site out the windscreen. Nothing to write home about. :p
Posting up GPS assisted grading does not count either. This is eyeball stuff.
I'll go first.
May '26
some excavator grade I made backing up and carrying, and matching to wall etc. This is where I ran out of material.
View attachment 362623

last summer storm pipe remove and replace.
Before:
View attachment 362626

During:
View attachment 362627

after:
View attachment 362628
No grade beaming or hoe packing, just scrape and track.
Shimmy I know you have some pretty tailing grade outs, those count.
Your eyeometre is still working good
 
Top