Olori Joshua
Well-Known Member
I am on the machine right now carrying out the tilt linkage position sensor calibration.
1. Was only able to pass the step one which is set the parking brake.
2. Got the attached error as I was racking back the bucket slowly as required by step two. The bucket has not rackback fully when I got the error, it was just in the middle from fully dump position to fully rackback position.
Could it be the sensor is bad?
But if I play with the sensor three pin connector by disconnecting it my ET will see it as voltage above normal
1. Was only able to pass the step one which is set the parking brake.
2. Got the attached error as I was racking back the bucket slowly as required by step two. The bucket has not rackback fully when I got the error, it was just in the middle from fully dump position to fully rackback position.
Could it be the sensor is bad?
But if I play with the sensor three pin connector by disconnecting it my ET will see it as voltage above normal
