• Thank you for visiting HeavyEquipmentForums.com! Our objective is to provide industry professionals a place to gather to exchange questions, answers and ideas. We welcome you to register using the "Register" icon at the top of the page. We'd appreciate any help you can offer in spreading the word of our new site. The more members that join, the bigger resource for all to enjoy. Thank you!

A few projects I have done recently

colson04

Senior Member
Joined
Apr 11, 2016
Messages
2,891
Location
Delton, Michigan
A close friend of mine's parents built a million dollar house on a lake some 20 years ago. His dad had a custom gun vault made in his basement during the construction for his collection. Poured walls, precast concrete lid, vault door brought in from somewhere. That vault room is bigger than the living room in the house I built 10 years ago. His entire collection and related equipment is stored there along with a super fancy reloading station. It's really nice, though very claustrophobic to be in with no windows and only the vault door to get out.
 

Welder Dave

Senior Member
Joined
Oct 11, 2014
Messages
17,922
Location
Canada
My former neighbour demo'd an old bank. Someone wanted the door for their basement. I heard they broke the stairs trying to get it in the basement. Neighbour just loaded the door and wasn't involved in installing it.
 

smifwal

Senior Member
Joined
Mar 6, 2024
Messages
378
Location
kansas city
My former neighbour demo'd an old bank. Someone wanted the door for their basement. I heard they broke the stairs trying to get it in the basement. Neighbour just loaded the door and wasn't involved in installing it.
A friend of mine broke his stairs trying to get a wood burning furnace in his basement, he has moved it 3 times since and had to beef up the stairs of every house after that
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
2 acre site we recently graded out 2/3 of the 2 acres for a future building pad. Same client which is a good friend of mine that we did the adjacent site for back in '23.

This 2 acres front the main road and will be home to 2 10K SF office/warehouse buildings for rent with the owner taking some space for their own business.

IMG_0999.jpeg

The lot we prep'd back in '23 to the left in the pic with a 10K SF building on it.

IMG_1001.jpeg

Used most of the iron on this one other than some of the small stuff. Brought the 953 off dump duty for this one. It was a track loader type of job.

IMG_1003.jpeg

Wrapped up.

IMG_1009.jpeg
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
A little demo and grading job for the largest GC we work for. Pretty simple job to remove the sidewalks, curb and paving in front of the existing building. This is for a private college that is turning this old warehouse into a recreational building with basketball and pickle ball courts and other multi-use spaces.

Brought both 305's and a 279. The 305E ran the hammer and the new 305 ran a bucket.

IMG_0982.jpeg

Our 2 larger hoes were busy on the pad job above so rented a 160 Link Belt to load the tri-axles out and catch a CO to demo the concrete stairs and excavate down to the lower level.

IMG_0984.jpeg

The CO for the stair removal and excavation.

IMG_0993.jpeg

Loading out the tri's. We had 2 trucks running one day and finished up with 1 the next day. Much faster and productive than trying the painstaking task of loading a 20 CY tri-axle dump with a mini.

IMG_0988.jpeg

I didn't run the 160 but my operator liked it.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
Trying out this Blue Diamond cutter that a friend of mine wants to sell.

Much needed 953C love in the background.

IMG_1002.jpeg

The cutter did a pretty darn good job mulching pines on our new project.

IMG_1006.jpeg

The little pines average around 4-6" and the cutter mulched them up pretty well.

IMG_1004.jpeg

Wanted to try a cutter rather than the normal clear and grubb method with an excavator, loader or dozer. Wanted to mulch as much as we could then strip it with the topsoil so we didn't have a huge pile of woody/soil debris we would have to haul off.

IMG_1005.jpeg
 

Shimmy1

Senior Member
Joined
Aug 14, 2014
Messages
5,556
Location
North Dakota
If you're serious about a mower, you will be much happier with a Bradco GroundShark. I've posted it before, 4 blades instead of 3, carbide tips under the rotor, best of all it has a flip-up chain shield so you don't kill anyone within 100 yards when cutting.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
Looks like that brush cutter chewed up stuff pretty well.

Performed better than I expected. If we cleared this with a hoe or a track loader we'd have a pile of debris to deal with. The cutter just mulched it.
 
Last edited:

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
If you're serious about a mower, you will be much happier with a Bradco GroundShark. I've posted it before, 4 blades instead of 3, carbide tips under the rotor, best of all it has a flip-up chain shield so you don't kill anyone within 100 yards when cutting.

This one has 4 blades on a square - a blade on each point. Does well for what we need and it's cheap. It does need a chain in front though.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
How is the 953 pivot leak holding up?

So far so good. The guys add oil to it and there is not a "dripping" leak yet.

The other day I got a number for an independent mechanic that left the Cat house to go out on his own and is supposed to be very good. Going to ring him up and see if he is interested in doing the repair.

One of our 279's just hit 3K hours and is in need of a DPF swap as well. He may get 2 jobs.
 

willie59

Administrator
Joined
Dec 21, 2008
Messages
13,926
Location
Knoxville TN
Occupation
Service Manager
This one has 4 blades on a square - a blade on each point. Does well for what we need and it's cheap. It does need a chain in front though.

Some of their cutters do have deflector chains on the front and rear. IIRC, on that particular model, it's designed to push against small sapling trees with the push bar, bend them over a bit and cut through them with the cutter, chains would interfere with this. Either way, just for safety, it's best to not having anyone near an operating brush cutter.
 

Welder Dave

Senior Member
Joined
Oct 11, 2014
Messages
17,922
Location
Canada
2 acre site we recently graded out 2/3 of the 2 acres for a future building pad. Same client which is a good friend of mine that we did the adjacent site for back in '23.

This 2 acres front the main road and will be home to 2 10K SF office/warehouse buildings for rent with the owner taking some space for their own business.

View attachment 359471

The lot we prep'd back in '23 to the left in the pic with a 10K SF building on it.

View attachment 359472

Used most of the iron on this one other than some of the small stuff. Brought the 953 off dump duty for this one. It was a track loader type of job.

View attachment 359473

Wrapped up.

View attachment 359474
Would a grader have been a benefit on that job or your laser grader on the CTL?
 

cuttin edge

Senior Member
Joined
Nov 9, 2014
Messages
4,215
Location
NB Canada
Occupation
Finish grader operator
Grader would be perfect there. But its one of those machines that's a big expense to have sitting in the yard if you don't use it everyday. The sportsplex we have been doing. They have been putting the gravel on the parking lot with the D4 and the GPS, and it's pretty much perfect. We do road work so a production size grader is justified. A company that would do more projects with a dozer, gps machine control and your golden.
 

CM1995

Administrator
Joined
Jan 21, 2007
Messages
15,946
Location
Alabama
Occupation
Running what I brung and taking what I win
Would a grader have been a benefit on that job or your laser grader on the CTL?

Nope. The D3 running the standard 2D handled the job quickly and much faster than the grader box for our 279's.

Grader would be perfect there. But its one of those machines that's a big expense to have sitting in the yard if you don't use it everyday. The sportsplex we have been doing. They have been putting the gravel on the parking lot with the D4 and the GPS, and it's pretty much perfect. We do road work so a production size grader is justified. A company that would do more projects with a dozer, gps machine control and your golden.

^^This. We have no need for a grader when a GPS/2D dozer handles what we do fine. Would it be awesome to have a grade - hell yeah but if I had one then I'd put GPS on it then have a $250K+ (for a small machine) piece of equipment that would get 10-15% utilization. Doesn't make sense.

The guys were able to find 3 of the old control points on site so we were able to run GPS. We didn't have a model for this project but they were able to set elevations.
 
Top