hoosier
Active Member
Just curious what kind of square yardage some of the operators get here on mainline milling.
My crew has been accused of "scarring the asphalt"..never heard of such garbage,as our cut looks good and the material is not chunking.
I am of the opinion if the cut looks good and the machine is running good,drop the hammer and run with it.
wirtgen w2000 6.8ft drum,we get an average of 20000 sq.yards on mainline on a good day,10 hrs...25K if the trucks are lined up good and we are able to water up on the move.
What do some of you long time milling operators think if the cut looks good and the machine is running good and the teeth etc..are good as well.
My crew has been accused of "scarring the asphalt"..never heard of such garbage,as our cut looks good and the material is not chunking.
I am of the opinion if the cut looks good and the machine is running good,drop the hammer and run with it.
wirtgen w2000 6.8ft drum,we get an average of 20000 sq.yards on mainline on a good day,10 hrs...25K if the trucks are lined up good and we are able to water up on the move.
What do some of you long time milling operators think if the cut looks good and the machine is running good and the teeth etc..are good as well.
Last edited: